1. Construction Observation/Administration Required
2. Periodic Review of Construction by Arch, Civil, or structural in general responsible charge (make a report)
3. Continuous inspection by qualified inspector (can be architect of record)
4. Structural design factor 1.5
5. Soils/geological report required
6. “Shall be designed…minimize fire hazards and resist… earthquakes, gravity & winds”
7. To be carefully reviewed by approval agency and carefully and completely inspected during construction
8. Communications, Main transformers, switching equipment, emergency backup generators, etc. must be adequately strapped and restrained to stay in service after an emergency